Projects

  • AS Sillamäe Sadam  – environmental management, waste management (reception bilge waters and an oil waste from ships), environmental monitoring;
  • OÜ NPM Silmet  – environmental management, waste management, monitoring of working conditions and natural environment;
  • AS Silpower  – environmental management, waste management, monitoring of working conditions and natural environment;
  • AS Ecometal  – preparation and procurement of the integrated environmental permit, waste management, monitoring of working conditions and natural environment;
  • AS SilSteve – environmental management and monitoring;
  • AS DBT – environmental monitoring;
  • Puma Energy Baltics AS Sillamäe Terminal – environmental monitoring;
  • Orica Eesti OÜ – environmental monitoring;
  • Close-down of the ash field No 2 and settling ponds at the Baltic Power Station – project management and construction supervision;
  • Sillamäe Radioactive Tailings Pond Remediation (closure) was carried out in the period 1997 – 2008; From 2009 to the present Ökosil Ltd performs control and monitoring of closed waste storage.

The Sillamäe Radioactive Waste Repository is located in the western part of the city of Sillamäe, in Ida-Viru County, directly on the shore of the Gulf of Finland. The repository covers an area of ​​nearly 40 hectares and contains approximately 12 million tonnes of uranium production waste (~4 million tonnes) and oil shale ash (~8 million tonnes), which have been deposited there since the Soviet Union’s secret uranium plant began operations in 1948.

Results After 2008

The remediation project concluded in December 2008. Today, the capped waste repository resembles a vegetated mound that effectively prevents significant water ingress. Radiation levels originating from the repository have been reduced to natural background levels; the stability of the dam is ensured by a line of reinforced concrete piles installed along the embankment, and coastal protection structures have been built to guard against erosion caused by the sea.

To evaluate the effectiveness of the completed remediation works and to monitor the environmental status of the waste repository and its surrounding area, annual post-remediation monitoring is conducted. This monitoring aims to track the environmental condition of the site and its vicinity, identify any significant changes, and assess the efficacy of the remediation measures. Furthermore, the site’s radiation safety is verified during this monitoring process, helping to bolster public confidence regarding the safety of the facility.

Thanks to the design and construction of a port—initiated in the early 2000s and opened for international maritime traffic on October 14, 2005—the seaward dam of the waste repository is now situated at least 400–450 meters from the sea (whereas previously it was no more than 30–50 meters from the water’s edge). This further enhances the safety level of the repository.

Below are visual views of the current state of the waste repository:

Vaade jäätmehoidlale idast. Koordinaadid X:6591779, Y:713061. 12. september 2023.  Vaade jäätmehoidlale kagust. Koordinaadid X:6591196, Y:712343. 12. september 2023.  Vaade jäätmehoidla pealt põhja poole. Koordinaadid X:6591921, Y:712000. 12. september 2023.

© 2020 Ökosil